Build Kisozi Dominion Church - Budget Breakdown
Vision & Expansion

Build Kisozi Dominion Church

Our Financial Roadmap for the Construction and Completion of Sanctuary Infrastructure in Buddo, Uganda.

Select View Currency

Total Sanctuary Infrastructure Cost

UGX 191,970,000/=

Church Land Allocation Cost

UGX 80,000,000/=

Phase 1: Main Structure & Shell

UGX 61,469,000/=
Item Specification Quantity Unit Rate Subtotal
Blocks 5,820 pcs 2,400 13,968,000
Cement 350 bags 35,000 12,250,000
Aggregates (Snow Truck) 1 trip 2,700,000 2,700,000
Hardcore 2 trips 1,100,000 2,200,000
Sand 3 trips 1,900,000 5,700,000
Bars Y12 102 pcs 45,000 4,570,000
Bars R8 70 pcs 22,000 1,540,000
Binding wire 3 rolls 170,000 510,000
BRC A98 3 rolls 750,000 2,250,000
Poles 250 pcs 5,000 1,250,000
Nails 3 bags 250,000 750,000
Kaveera (DPC) 3 rolls 500,000 1,500,000
Vents 150 pcs 10,000 1,500,000
Transport & Logistics — — 2,000,000
Shell Construction Labour — — 4,760,000

Phase 2: Structural Steel Framing & Roofing

UGX 33,501,000/=
Item Specification Quantity Unit Rate Subtotal
Steel Bars (60×40×2m) 30 pcs 65,000 1,950,000
Steel Bars (40×40×1.5m) 20 pcs 40,000 800,000
Z-Purlins 153 pcs 95,000 14,535,000
Iron Sheets 68 pcs 52,000 3,536,000
Consumables (Discs, Oxide, Screws) — — 2,350,000
Cycling Fans 4 pcs 450,000 1,800,000
Structural Roofing Labour — — 8,530,000

Phase 3: Custom Windows & Doors

UGX 14,750,000/=
Item Specification Quantity Unit Rate Subtotal
Windows (3×8 Fitments) 6 pcs 450,000 2,700,000
Windows (4×8 Fitments) 2 pcs 400,000 800,000
Windows (3×5 Fitments) 5 pcs 400,000 2,000,000
Window Glazing / Glasses 13 pcs 150,000 1,950,000
Doors (3×8 Structural) 5 pcs 400,000 2,000,000
Main Entry Doors (12×10) 1 pc 400,000 400,000
Reinforced Door Frames — — 2,500,000
Opal Glass Accents (Opec) 6 pcs 400,000 2,400,000

Phase 4: Exterior & Interior Finishes

UGX 56,850,000/=
Item Specification Quantity / Spec Unit Rate Subtotal
Plastering Plaster Sand 2 trips 2,000,000 4,000,000
Plastering Cement 170 bags 35,000 5,950,000
Premium Church Floor Tiling 370 SQM — 23,000,000
Tile Setting Cement 150 bags — 5,250,000
Adhesives & Tile Grout — — 750,000
Spacers & Setup Accessories — — 500,000
Comprehensive Paint Materials & Work Full Cover — 8,000,000
Plastering & Tiling Labor Provision Expert Team — 9,400,000

Phase 5: Power, Water Grid & Sanitary Block

UGX 25,400,000/=
Item Specification Scope of Work Unit Rate Subtotal
Electrical Grid Connection & Power Setup Complete Rigging 4,000,000 4,000,000
Electrical Engineering Labor Certified Team — 1,900,000
Water Drilling Rig & Reserve Tank Deep Borehole — 6,500,000
Sanitary Complex Block (6 Toilets, 1 Urinal, 1 Bathroom) Civil Structures — 13,000,000
Giving & Support

Support the Sanctuary Build

Your contributions directly support the procurement of building materials, labour and construction milestones outlined in the roadmap above.

MTN Mobile Money
+256 782 093242 Copy
Airtel Money
+256 759 550019 Copy
Equity Bank
1033203478392 Copy
Canada Giving
e-Transfer PayPal
For Giving Details kdominionch@gmail.com